Free · five to seven minutes · see your full result, no email needed

Production, Service and Operational Control Maturity Check

Score. Diagnose. Decide.

Eight elements of a production and service provision procedure, scored on coverage and on whether the process holds on a busy week — not on what the document claims. Your band and your weakest element appear the moment you finish, before you enter anything. Answer for how the work actually runs, not for how it is written up.

Check the standard your procedure has to satisfy

Select every standard this one procedure has to serve. The core check is 18 questions. Selecting ISO 13485 adds three on device, sterile and traceability obligations; selecting ISO 14001 adds three on operating criteria, unintended change and the life cycle perspective.

Common questions

Maturity check FAQ

Ask. Answer. Apply.
What does this maturity check measure?

It scores your production and service provision procedure across eight elements — controlled conditions, competence and authorization, validation and revalidation, human-error prevention, identification and traceability, preservation and property, change control, and release authority. Each element is rated on four levels: Documented, Controlled, Measured and Anticipatory. The score reflects how the work actually runs, not what the document claims.

Do I have to enter an email to see my result?

No. Your band, your weakest element and the full element-by-element breakdown all appear the moment you finish, without entering anything. An optional field lets you have the full framework emailed to you — the eight elements written out level by level, the questions behind each one, and the priority order to work them in — but the complete result is free and shown first. Skip the email and you lose nothing.

How long does it take?

Five to seven minutes. The core check is 18 questions. Selecting ISO 13485 adds three covering device, sterile and traceability obligations. Selecting ISO 14001 adds three covering operating criteria, the consequences of unintended change, and the life cycle perspective. The added questions are triggered by which standards you select, not by how many.

Which standards does it cover?

ISO 9001, ISO 13485, ISO 14001:2026, ISO 45001 and ISO 7101. The requirement lives at ISO 9001 Clauses 8.5 and 8.6, ISO 13485 Clause 7.5, ISO 14001:2026 and ISO 45001 Clause 8.1, and ISO 7101 Clause 8.9. The eight elements are common to all five; selecting a standard adds only the questions that standard actually imposes.

What do the four levels mean?

Documented means the element is written down but not yet reliably controlled. Controlled means the process holds on a normal week and would satisfy an auditor — a legitimate place to stop. Measured means the process produces data that tells you things before an auditor does. Anticipatory means it prevents problems ahead of time. The ladder shows the next rung; it does not require you to reach the top.

Is Controlled a passing result?

Yes. Conformity is a threshold, not a destination. A well-implemented certified system sits at Controlled, and the check says so outright rather than implying anything below the top rung is a deficiency. The point is to show you which one or two elements are worth lifting, not to fail everyone.

What is the one element most procedures miss?

Human-error prevention. ISO 9001 has required actions to prevent human error since the 2015 revision, but the requirement was new that year with nothing to map from during transition, so it fell through in most systems. Most procedures answer it with operator training — which is competence under a different clause, not error prevention. The check scores it as its own element.

What does ISO 14001:2026 add that ISO 9001 does not ask for?

Three things this check scores separately. Operating criteria established for the activities associated with your significant environmental aspects. A requirement to review the consequences of unintended change and mitigate adverse effects, where ISO 9001 Clause 8.5.6 covers planned change only. And the life cycle perspective at Clause 8.1 d) — considering the need to provide information about potential significant impacts from transportation, use, end-of-life treatment and final disposal. The last one is a genuine requirement that very few procedures implement, because it asks about the product after it has left.

What should I do with my result?

If the single weakest-element finding is useful on its own, act on it — you do not need anything further. If you want the rung above the one you are on written out, the complete procedure carries it. And if a low element might be a real exposure rather than a recording gap, a planning session will tell you which — call 760-434-9141.

Management Systems International (MSI) · 28 years · 80+ certifications supported · 200+ audits attended · 760-434-9141

Don't miss our latest news!

Get on our Email list. MSI emails new offers, training dates, and ISO updates to our list before anyone else.

Twenty-eight years of practice, written down.
New: complete ISO procedure templates and guides. 13 procedure topics, five standards and combos, editable Word — with the judgment calls already made.
See the templates →